Undo information

Time Operation User
02/03/2015 16:27:44 UPDATE nerifern
Table Sub# Column Undo Value Current Value
T_OBLIGATION 0 AUTHORITY Art. 4,5 Article 4 & 5
T_OBLIGATION 0 COMMENT Member States shall make use of the administrative arrangements made under Article 3 of Directive 2000/60/EC or appoint units of management different from river basin districts.
T_OBLIGATION 0 CONTINOUS_REPORTING no no
T_OBLIGATION 0 COORDINATOR null
T_OBLIGATION 0 COORDINATOR_ROLE null extranet-wise-nfp
T_OBLIGATION 0 COORDINATOR_ROLE_SUF 0 0
T_OBLIGATION 0 COORDINATOR_URL null
T_OBLIGATION 0 DATA_USED_FOR null
T_OBLIGATION 0 DATA_USED_FOR_URL null
T_OBLIGATION 0 DATE_COMMENTS The PFRA shall be completed by 22/12/2011 and made available to the Commission three months after. First review, and if necessary update, 22/12/2018. The PFRA shall be completed by 22/12/2011 and made available to the Commission three months after. First review and, if necessary, update, is due by 22/12/2018 and every 6 years thereafter.
T_OBLIGATION 0 DESCRIPTION EC Water Reporting Obligation Member States shall identify areas for which the potential significant flood risks exist for each river basin district or unit of management on the basis of a preliminary flood risk assessment (PFRA). Replaced by: http://rod.eionet.europa.eu/obligations/776 Article 4 of the Floods Directive requires Member States to undertake a Preliminary Flood Risk Assessment (PFRA) for each river basin district, unit of management or the portion of an international river basin district or unit of management lying within their territory. The identification of Areas of Potential Significant Flood Risk (APSFR, Article 5) will be based on available or readily derivable information, including the requirements specified in Article 4 (PFRA) in the Directive. In the 1st implementation cycle Member States may apply Article 13.1 (transitional arrangements) and either report on a PFRA carried out before 22 December 2010 (Article 13.1(a)) or proceed directly to mapping and establishment of flood risk management plans (Article 13.1(b)). If Article 13.1(a) is applied, the result will include the identification of APSFR (Article 5), if Article 13.1(b) is applied, APSFR will not be identified; instead maps at the appropriate scale according to Article 6 (see Flood Hazard Maps and Flood Risk Maps) will be prepared.
T_OBLIGATION 0 DPSIR_D no 0
T_OBLIGATION 0 DPSIR_I yes 0
T_OBLIGATION 0 DPSIR_P no 2019-03-22 00:00:00.0
T_OBLIGATION 0 DPSIR_R no ,3,5,7,8,9,10,11,12,13,14,15,16,17,19,20,21,22,23,25,27,29,30,31,33,34,35,36,40,
T_OBLIGATION 0 DPSIR_S yes 630
T_OBLIGATION 0 EEA_CORE 0 1
T_OBLIGATION 0 EEA_PRIMARY 0 Floods Directive reporting resources
T_OBLIGATION 0 FIRST_REPORTING 2019-03-22 2021-05-11 06:18:31.0
T_OBLIGATION 0 FK_CLIENT_ID 104 2019-05-13
T_OBLIGATION 0 FK_DELIVERY_COUNTRY_IDS ,3,5,7,8,9,10,11,12,13,14,15,17,16,19,21,20,23,22,25,27,29,31,30,34,35,33,36,40, CDR
T_OBLIGATION 0 FK_SOURCE_ID 630 http://cdr.eionet.europa.eu/
T_OBLIGATION 0 FLAGGED 0
T_OBLIGATION 0 FORMAT_NAME Floods Directive reporting resources
T_OBLIGATION 0 LAST_HARVESTED 2015-03-02 17:12:42.0 2013-03-22 00:00:00.0
T_OBLIGATION 0 LAST_UPDATE 2014-02-20 2019-03-22 00:00:00.0
T_OBLIGATION 0 LEGAL_MORAL L
T_OBLIGATION 0 LOCATION_INFO CDR 601
T_OBLIGATION 0 LOCATION_PTR http://cdr.eionet.europa.eu/ The Reporting sheet for the Preliminary Flood Risk Assessment (30/11/2009) is available at Flood Risk Management WFD CIRCA library at https://circabc.europa.eu/w/browse/71b62986-603f-416d-9d9e-e25cdbd1a130
T_OBLIGATION 0 NATIONAL_CONTACT null http://icm.eionet.europa.eu/schemas/dir200760ec/resources
T_OBLIGATION 0 NATIONAL_CONTACT_URL null
T_OBLIGATION 0 NEXT_DEADLINE 2019-03-22
T_OBLIGATION 0 NEXT_DEADLINE2 2025-03-22 72
T_OBLIGATION 0 NEXT_REPORTING null extranet-floods-data
T_OBLIGATION 0 OVERLAP_URL null 0
T_OBLIGATION 0 PARAMETERS null Y
T_OBLIGATION 0 PK_RA_ID 601 Floods Directive - Preliminary Flood Risk Assessment and Areas of Potential Significant Flood Risk - 2012
T_OBLIGATION 0 REPORTING_FORMAT Floods Directive reporting resources at ETC/ICM web site contains support files for reporting including help documents and schemas (PFRA, APSFR). The Reporting sheet for the Preliminary Flood Risk Assessment (30/11/2009) is available at Flood Risk Management WFD CIRCA library at https://circabc.europa.eu/w/browse/71b62986-603f-416d-9d9e-e25cdbd1a130 The WFD Common Implementation Strategy (CIS) supports the implementation of the Floods Directive, through Working group F on Floods developing the reporting formats.
T_OBLIGATION 0 REPORT_FORMAT_URL http://icm.eionet.europa.eu/schemas/dir200760ec/resources 2017-10-17 00:00:00.0
T_OBLIGATION 0 REPORT_FREQ null